On the Critical Path
On the Critical Path poster

On the Critical Path

1971·22 min
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
Documentary
Original Title
On the Critical Path
Original Language
English
Production Country
Canada
Release Date
01/01/1971